Genesys CTI User Forum
		Genesys CTI User Forum => Genesys CTI Technical Discussion => Topic started by: Victor on January 01, 1970, 12:00:00 AM
		
			
			- 
				Hi, all,
i was wondering if someone could please help me here.
We are testing TServer for Symposium 5.1.583.25 on Meridian 61C Release 25 and TServer deletes the call whenever user tries to put a call on hold.
To be precise, the problem is in the current message:
link: Progress
        ReferenceID: 58
        Origination Address:ACD DN/ACD Position,5701
        Destination Address:Unknown
        Event:refer to connection status
        Connection Status:Hold Done
        Origination TN:406
        Destination TN:406
        Call ID:33a0019
parse_mlink_address: msg 0808  address   apply 1
??      (process_progress) !orig_dn
@14:38:42.4616
**      ml_rq_timeout_clean: no response for request_id 51, timeout 123 s
@14:38:42.4618
**      mlink_scan_rq_list: total 2, deleted 1
For Origination Address, it should be saying Unknown, 5701, but instead it says ACD DN/ACD Position, 5701.
We had a similar problem with Meridian link which has been resolved by applying a patch; however, after checking with Nortel, there are no patches that can be found for Symposium link to resolve a similar problem.
Anyone else had the same problem and what might be a possible way of fixing it. I assume there must be a patch out there to fix it; unfortunately Nortel Japan is not aware of it.
Thanks,
Vic