Genesys CTI User Forum
Genesys CTI User Forum => Genesys CTI Technical Discussion => Topic started by: blakshmikanth on January 22, 2008, 10:56:45 AM
-
Hi,
I need clarification on "Cost Based routing solution" in CME. If it is, what are the obejcts need to be configured. Can I have more insight into this?
Thanks for your assitance.
Regards,
Lakshmikanth
-
Hi,
I would suggest you to read 4th chapter "Cost-Based Routing" of the manual "Genesys Universal Routing 7.5 Routing Solution Guide". You will find there description of the functionality, how it works and configuration steps.
The guide can be downloaded from Genesys Technical Support website.
R.
-
Thanks. I got it