Hi Guys,
I am trying to generate as much load on Genesys using Avaya CM Tserver but with test simulator kit. I have tried doing 30 Calls/sec and generating 30000 calls to 1000a gents but I can see in IRD almost 18000 enter the strategy, no idea where others are lost and also in CCAS agents give error that " did not get event-> Event Released".

Can anyone share their exepreinces of load testing like how much we can achieve with a single T server and a URS. Do i need to add another URS or is there any configuration that is required in Tserver/URS to achieve load testing

Offline Kubig

  • Hero Member
  • *****
  • Posts: 2755
  • Karma: 44
Re: Genesys Load Testing
« Reply #1 on: January 26, 2016, 08:21:50 AM »
This can depends on used hardware. Did you try to check the logs, why the calls was "dropped"?

Offline nomster123

  • Jr. Member
  • **
  • Posts: 58
  • Karma: 0
Re: Genesys Load Testing
« Reply #2 on: January 26, 2016, 09:17:53 AM »
Ill review the logs. Hardware im using is 64-bit Windows, 10GB RAM and 2.33 GHz (4 processors)

Offline cavagnaro

  • Administrator
  • Hero Member
  • *****
  • Posts: 7641
  • Karma: 56330
Re: Genesys Load Testing
« Reply #3 on: January 26, 2016, 01:45:41 PM »
Do you have enough licenses to that on Cisco channels?