Hi,

Currently our Framework applications and CCA applications are running on separate servers.
We are thinking to put both in one AIX 5.3 server. I was wondering by doing this will I run into any performance issue.
Please share your experience if you have any.... Thanks.

Offline Adam G.

  • Hero Member
  • *****
  • Posts: 552
  • Karma: 12
  • Still Gorgeous.......
Re: Performance Question
« Reply #1 on: September 13, 2007, 04:52:15 PM »
Distributed is always best. Also if it works well why change?

Offline vivek

  • Jr. Member
  • **
  • Posts: 55
  • Karma: 0
Re: Performance Question
« Reply #2 on: September 14, 2007, 12:24:37 PM »
The reason company wants to save money in server maintenance, etc.

Offline CTIgem

  • Sr. Member
  • ****
  • Posts: 273
  • Karma: 0
Re: Performance Question
« Reply #3 on: September 14, 2007, 05:08:29 PM »
I would check cpu/mem usage in current setting. If it is minimal, move it one component at a time.

Offline victor

  • Administrator
  • Hero Member
  • *****
  • Posts: 1419
  • Karma: 18
Re: Performance Question
« Reply #4 on: September 15, 2007, 10:49:01 AM »
The only thing I would worry about is how much of a load your Datasourcer would cause to your StatServer. In many instances we found statserver cause an incredible amount of load on a system when used by CCA and you have over a 1000 people. Add to that database (which I assume you would also host on the same server as well, right) and ETL, and I think you need to really plan ahead.

If you are talking about 200 people or less, I would not even think twice + just move the whole thing. If you have close to 1000, I would really consider keeping your architecture as distributed as possible. We rely on redundancy a lot at our call center, so, having everything jammed into one PC brings a lot of other issues besides the load that you will need to address.

So, the bottom line - go for it if it is under 200 people, but keep in mind that you should expect triple load amount of the sum of all your existing Genesys products.

Offline vivek

  • Jr. Member
  • **
  • Posts: 55
  • Karma: 0
Re: Performance Question
« Reply #5 on: September 17, 2007, 12:35:41 PM »
Thanks to Victor and others.
Yes, we have around 200 agents. I think we are good to go ahead.